National defense and military industry

Engineering Background
Special underground protective structures—such as underground command posts and military reserve depots—require structures with extremely high resistance to seepage, earthquake, and explosion.
Technical Challenges
The structural fissures are extremely fine, and conventional cement cannot fill them.
The environmental requirements are extremely high; the materials must be resistant to high temperatures, corrosion-resistant, and have a long service life.
Product Corresponding Features
Ultrafine particle size: Fatigue cracks with a size less than 0.05 mm can be detected;
Waterproofing performance: Permeability coefficient ≤ 10⁻¹⁰ m/s;
Physicochemical stability: Inorganic mineral system, non-volatile, corrosion-resistant, and high-temperature resistant.
Professional Processes and Parameters
Hidden deep reinforcement: Form a sealed and consolidated body within the concrete component;
Sealing and anti-seepage treatment: Enhance the overall integrity and concealment of the structure;
Recommended parameters: Grouting pressure: 5–10 MPa; water-to-cement ratio: 1.0–1.3.
Engineering benefits
Significantly enhance resistance to detonation, ensuring the facility’s long-term safe and stable operation;
Waterproofing performance: The permeability coefficient of microfractures has decreased from 10⁻⁶ cm/s to ≤10⁻¹⁰ cm/s, meeting the standards for nuclear-grade and military engineering applications.
Holistic Enhancement: The compressive strength of the protective structure is increased by 20–30%, and its impact toughness is improved by 25–40%.
Anti-knock capability: The structure maintains its integrity under simulated detonation loads of 0.5–1.0 MPa, and the failure mode transitions from brittle failure to ductile failure.
Lifecycle: The engineering maintenance cycle has been extended from major overhauls every 5–8 years to over 20 years, reducing the maintenance frequency by 60–70%.
Economic benefits: Long-term safe operation reduces the substantial replacement and protection costs associated with facility failures, with potential savings per single large military facility reaching hundreds of millions of yuan.
Business alignment target department
Military engineering planning and design departments, facility maintenance units.
RELATED PRODUCTS
Related products
Applications include grouting in underground mining operations in complex geological settings, drilling and production well cementing for oil and gas wells to prevent leaks, reinforcement and strengthening of hydraulic and hydroelectric dam structures, waterproofing and leak-stopping in metro systems and tunnels, repair and waterproofing of concrete cracks and delaminations in buildings, restoration of historic structures, seepage control in the surrounding rock of nuclear power plants, treatment of tailings and solid waste, preparation of ultra-high-strength concrete, and reinforcement of soft soil foundations, among other engineering applications.
View detailsUltra-fine oil and gas well cement
Suitable for cementing, leak sealing, and repair operations in oil wells, gas wells, and shale oil and gas wells, particularly for sealing and reinforcement requirements in microfractured formations, low-permeability reservoirs, and complex well conditions.
View detailsKangjing ultrafine ground granulated blast-furnace slag (GGBS) is produced by ultrafine grinding of blast-furnace slag.
View detailsUltra-High-Performance Accelerator
This product is a high-performance, inorganic-mineral-based activating material independently developed by Kangjing New Materials Co., Ltd. It enhances the efficiency of cementing operations in shale oil and gas wells, while also accelerating the early strength development of cement and concrete and improving certain concrete properties. Moreover, it exhibits excellent alkali resistance, making it particularly suitable for large-scale applications in marine engineering and highly corrosive environments on offshore platforms.
View details
Kang Jing's Official Account
Kang Jing WeChat Customer Service
Northwest Center: Shaanxi, Xi'an, Weiyang, Room 2002, Rongmin Group
Email:
Website:
WhatsApp:8618809236578
Ms. Jin:+86 18165358316
International email:expor@kangjinggrouting.com
Domestic email:kjgf@crystalnew.cn